Installation
Patio Door Shutters by QMI
How will your patio doors be installed?
![](https://roll-a-way.com/images/homesafe/install_door.jpg)
We measure, manufacture, install, and warranty every shutter, sole-source. No finger pointing.
![](https://roll-a-way.com/images/homesafe/install_step1.jpg)
Step 1
Side rails are mounted to building structure with code-approved fasteners to ensure the building is protected.
![](https://roll-a-way.com/images/homesafe/install_step2.jpg)
Step 2
The shutter tube and brackets are attached to the side rails.
![](https://roll-a-way.com/images/homesafe/install_step3.jpg)
Step 3
The entire assembly is tucked just under the soffit for a clean look, but also to reduce bird nesting sites.
![](https://roll-a-way.com/images/homesafe/install_step4.jpg)
Step 4
Tap-con screws attach the side rails. Mounting holes are covered with matching hole plugs.
![](https://roll-a-way.com/images/homesafe/install_step5.jpg)
Step 5
Every shutter is tested in the plant for operation before shipping to the customer.
![](https://roll-a-way.com/images/homesafe/install_step6.jpg)
Step 6
A decorative color-matched service panel is attached to the industry’s smallest shutter box.
![](https://roll-a-way.com/images/homesafe/install_open.jpg)
Patio door shutters in the open position.
![](https://roll-a-way.com/images/homesafe/install_closed.jpg)
Patio door with shutter in the closed position.